Questions,answered

The things people ask us most. If yours isn’t here, give us a call.

New pools

Building a pool

How long does a new pool take?

Contract, engineering and permit usually take about 4–6 weeks. Excavation starts within two weeks of receiving your permit, followed by steel, plumbing and sprayed concrete, so your shell is complete in roughly 7–10 days. Equipment, tiling, coping, fencing and inspection follow before we fill it.

What do I need to provide?

When you sign your SPASA contract you’ll need a copy of your Certificate of Title, a block plan showing all existing buildings, a water board plan of your site showing mains and any easements, and a soil test.

Do you handle engineering and permits?

Yes. We supply structural engineers’ drawings with your Home Owners Warranty Insurance application, lodge your building permit, and arrange the building inspection.

Why do you only build concrete pools?

Concrete is structurally sound and built to engineers’ specifications. It can be any shape or size, suits difficult sites, can even be built out of the ground, and lets you add split levels, swim-outs, islands, rock pockets, water features and your choice of interior.

Which interior should I choose?

Silkstone (fine 1mm pebbles with acrylic glass beads) is the easiest to maintain. Full glass gives unmatched depth of colour, and a fully tiled pool is the luxury option and an Alpine speciality. We’ll bring samples so you can compare.

Safety & law

Fencing & insurance

Do I need a pool fence?

Yes. By law every pool and spa must be fully fenced to Australian Standards, and compliant fencing must be in place before the pool can be filled. We supply glass, timber or metal fencing in a range of colours.

Is builders warranty insurance included?

We provide Builders Warranty Insurance, a legal requirement for any job over $20,000. Its cost is around the same as a permit.

Softfall

Softfall rubber

What is wet-pour softfall?

A seamless rubber surface laid on site in two layers: a shock-absorbing base of recycled rubber and a coloured, UV-stable EPDM top layer bound with polyurethane and trowelled smooth. There are no joins, loose material or trip edges.

How thick does it need to be?

Under play equipment, the depth is set by the equipment’s fall height, following the Australian playground surfacing standard (AS 4422). For paths and pool surrounds a thinner layer is usually enough. We’ll recommend the right build-up at your site visit.

Can it go around a pool?

Yes. Wet-pour rubber is porous, so water drains through it, and it stays slip resistant when wet, which makes it a comfortable, safer surface for pool surrounds.

Existing pools

Renovations & fill-ins

Can you renovate my old pool?

Yes. We’ve completed thousands of renovations over three decades: new interiors, paving and coping, landscaping, or shortening and reshaping them.

Can you fill in a pool?

Yes, quickly. We break up the pool for natural drainage and under-pool pressure, then fill it with clean fill or packing sand if you plan to pave or build over it.