ALPINEPools & Landscape Construction 03 9808 5033 Free site visit
Blue glass mosaic pool interior

Your own private resort

Bespoke concrete pools, spas and landscapes, designed and built for Victorian families for more than fifty years.

This water is live. Move across it.

Since 1972

We shape concrete, steel and stone into backyards where Victorian families slow down. Any shape, any size, built by one licensed team from the first sketch to the first swim.

Our story
1972The year Alpine began building in Victoria
50+Years of pools, spas and landscapes
1000sOf renovations over three decades
10Clear steps from first call to handover

What we do

Everything your backyard needs

Four services, one team. Whatever you’re planning, we design it and build it, start to finish.

Green tiled concrete pool with garden
01 / 04

Swimming pools & spas

Steel-reinforced concrete built to engineers’ drawings, in any shape your yard allows. Fully tiled, Silkstone or pebble interiors, with split levels, swim-outs, islands and waterfalls.

  • Fully tiled
  • Infinity & plunge
  • Solar heating
Explore pools
Renovated pool beside a sandstone wall
02 / 04

Renovations & fill-ins

New interiors, paving and coping, shortening a pool or converting it to a swim spa or water tank. Or fill it in and reclaim the yard.

  • New interiors
  • Conversions
  • Fill-ins
See renovations
Rock garden and native planting around an infinity pool
03 / 04

Alpine Landscaping

With our partners at Earth Aspects: natural stone, paving, water features, garden beds, retaining walls, compliant glass fencing and rainwater tanks.

  • Natural stone
  • Glass fencing
  • Water tanks
Plan the whole yard
Blue softfall play area with hippo sculptures
04 / 04

Softfall rubber applications

Seamless wet-pour rubber that cushions falls, drains after rain and stays slip resistant underfoot. Ideal for play areas, pool surrounds, paths and garden spaces.

  • Wet pour
  • Play areas
  • Pool surrounds
Explore softfall
Dark tiled plunge pool with stainless ladder beside a steel-framed glass wall

Why concrete

Built to outlast.
Think Rome.

Concrete is structurally sound, built to an engineer’s specification and free to take any shape, even on the most difficult sites. Some of the world’s oldest surviving pools are concrete.

  • Split levels
  • Swim-outs
  • Walk-in entries
  • Islands
  • Rock pockets
  • Cantilevered walkways
  • Waterfalls

Our work

Pools we’re proud of

Scroll or drag to turn. Tap a photo to open it.

Full gallery

The process

From first call to first swim

Around 4–6 weeks to permit. Excavation within two weeks of approval, and your shell complete in roughly 7–10 days.

Start step one
  1. 01

    Get in contact

    Nominate your location. We assess the site and design a solution that fits your needs.

  2. 02

    Sign your SPASA contract

    Provide a copy of your Certificate of Title, a block plan showing existing buildings, a water board plan showing mains and easements, and a soil test.

  3. 03

    Engineering

    We supply structural engineers’ drawings along with your Home Owners Warranty Insurance application.

  4. 04

    Building permit

    Lodgement and approval of your building permit. Up to this point the timeline is roughly 4–6 weeks.

  5. 05

    Site & pool preparation

    Excavation within two weeks of receiving your permit, then steel, plumbing and sprayed concrete. About 7–10 days to a finished shell.

  6. 06

    Pool installation

    Installation and plumbing of your equipment, solar heating, waterline tiling, coping and landscaping.

  7. 07

    Pool fencing

    Compliant fencing must be in place before the pool can be filled.

  8. 08

    Building inspection

    We arrange and obtain the building inspection for you.

  9. 09

    Practical completion

    A final finish and clean, followed by filling your pool.

  10. 10

    Alpine handover

    We walk you through your equipment, the maintenance schedule and how to keep your pool water healthy.

It’s our mission to build a pool to fulfil your vision by listening to your needs.

Adam CartledgeDirector, Alpine Pools and Spas
  • Licensed builder

    Your build is carried out by a licensed builder and an experienced team.

  • SPASA contracts

    Industry-standard contracts that set out every stage clearly.

  • Warranty insurance

    Home Owners Warranty Insurance arranged for your build.

  • One team

    Design, permits, build and landscaping, all with us.

Good to know

Questions, answered

All FAQs
How long does a new pool take?

Contract, engineering and permit usually take about 4–6 weeks. Excavation starts within two weeks of the permit, and the concrete shell is finished in roughly 7–10 days. Equipment, tiling, coping, fencing and inspection follow before we fill it.

What do I need to provide?

Your Certificate of Title, a block plan showing existing buildings, a water board plan showing mains and easements, and a soil test.

Do I need a pool fence?

Yes. By law every pool and spa must be fully fenced to Australian Standards, and the fence must be in place before the pool is filled. We supply compliant glass, timber or metal fencing.

Can you renovate or fill in my old pool?

Yes. We refresh interiors, replace paving and coping, shorten pools or convert them to swim spas or water tanks. Or we break the pool up and fill it with clean fill or packing sand, ready for paving or building.

Let’s create your private resort

Book a
site visit